ecorain_logo
Deutsch (DE-CH-AT)English (United Kingdom)Russian (CIS)Português (pt-PT)
kopfbild-ecorain-standard
References | Print |

The ECO Rain® Root Zone Irrigation Mat has proved itself worldwide with simple irrigation and installation even in projects that are considered extremely difficult with regards to irrigation.


Test site: Abu Dhabi, UAE

abudhabi_nach
  • Installation in April 2007
  • Regular monitoring of irrigation times and results
  • Root development of 25 cm depth within 6 weeks
  • Proven water saving of 45 % compared to the conventional irrigation system (sprinkler) which was installed in parallel (after initial basic settings of the system)
  • Due to the very positive result of the irrigation, the irrigation times are reduced further so that a water saving of approx. 60 % is to be expected.

Project: Seaport in Hamburg

hafencity_vor hafencity_nach
Installation in Mai 2007
Monitoring in August 2008

Project: Münzmeisterstraße, Dresden

muenzmeisterstrasse_vor
muenzmeisterstrasse_nach
Installation in Mai 2007
Monitoring in August 2008

Project: Airportcity, Düsseldorf

airportcity_vor airportcity_nach
Installation Monitoring in April 2009

Project: Waterfront Jebel Ali, UAE

waterfront_jebel_vor
waterfront_jebel_nach
Installation in October 2008
Monitoring in January 2009

Project: Roof greening, Mallorca

mallorca_vor
mallorca_nach
Installation Result

Project: Queenstown, New Zealand

queenstown_vor
queenstown_nach
Installation in October 2008
Monitoring in March 2009

Project: Milbrook golf course, New Zealand

milbrook_vor
milbrook_nach
Installation in October 2008
Monitoring in March 2009

Project: Kesseldorfer Straße, Dresden

kesseldorfer-strasse_vor
kesseldorfer-strasse_nach
Installation in April 2009
Monitoring in Juni 2009

Project: Côte d’Azur, France

cote-d-azur_vor
cote-d-azur_nach
Installation in April 2009
Monitoring in June 2009

Project: Roof greening, Twistringen

twistringen_vor
twistringen_nach
Installation in April 2009
Monitoring in June 2009

Project: Roof greening , England

england_vor
england_nach
Installation in Mai 2009
Monitoring in June 2009